
ニュース&イベント
最新のニュースやイベントの最新情報を入手してください。

How Much Test Coverage Is Enough Before a Product Goes to Field?
A risk-based method for OEM teams to decide whether PCBA production test coverage is sufficient before field release, without relying on an arbitrary coverage percentage.
もっと読む

Why Late PCB Test-Point Decisions Slow Down Pilot Builds
Why late PCB test-access decisions create layout, fixture and test-program churn, with practical gates for access closure before pilot release.
もっと読む
Edge AI Requalification After Product Changes
Learn how to decide what must be revalidated when an Edge AI product changes—from sensors and firmware to models, memory, thermals and production test.
もっと読む

Edge AI Environmental Validation Under Stress
Why Edge AI environmental validation must measure inference quality and timing—not just hardware survival—and how to build an environment-to-inference evidence chain.
もっと読む

How to Production-Test an Edge AI Product
How to production-test Edge AI hardware when model outputs are probabilistic: deterministic checks, sensor limits, replay testing, inference criteria and traceability.
もっと読む

Sensor Variation in Edge AI Production
How OEM teams can translate sensor and assembly variation into calibration, DFT, production test, traceability and requalification controls for Edge AI products.
もっと読む

Edge AI Processor Selection: What to Measure Beyond TOPS
A practical evidence framework for Edge AI processor selection: model quality, application latency, concurrency, thermal behavior, and requirement margin before architecture freeze.
もっと読む

Why Edge AI Hardware Can Fail During Scale-Up
Why can a validated Edge AI prototype fail at scale? Learn how sensor, thermal, compute, configuration and manufacturing variation affect production readiness.
もっと読む

How OEMs Should Evaluate EMS Partners for High-Mix Low-Volume Electronics Manufacturing
How to evaluate an EMS partner for high-mix low-volume electronics — the operating discipline, test strategy, BOM control, and change management that decide a program, beyond unit price
もっと読む

EMS Transfer Readiness for High-Mix Industrial Electronics
Product transfer to an EMS partner fails when design completion is mistaken for manufacturing readiness. The eight things to finalize before pilot build.
もっと読む

Join us to stay updated with our latest blog updates, manufacturing and assembly trends, news and announcements!
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

